Tender information C-4

Published Date

Name of the contract: Design and construction of Civil and Building works including Testing and commissioning of 237 kms length of mainline for Mumbai- Ahmedabad High Speed Rail corridor
Alignment: Between Zaroli village at Maharashtra- Gujarat Border and Vadodara in the state of Gurjarat, (length: 237.10 km i.e 47% of total alignment of 508 km), elevated except one mountain tunnel of about 280m. 24 nos of river crossings and 30 nos of road & canal crossings.
Stations: 04, Vapi, Bilimora, Surat and Bharuch (all in Gujarat)
Time lines: 42 months (Bid preparation time is 4 months with the closing date of 15th July 2019)
Current status of the project:
 About 30 % of the land required for the project has been acquired, NHSRCL expects that by the time the tender will be finalised i.e by November 2019, the required land would be available.
 
Tender link:
https://www.nhsrcl.in/view-tender-details?tender-id=MTI0