Skip to main content
Innerpage slider

Active Tenders

Active Tenders

With effect from 1st July 2020, NHSRCL has moved its tendering process to CPP portal ( e- tender mode), please click here to see all new tenders.

S.No. Tender Ref No. Tender Title Date of NIT Latest Corrigendum Last Date of Submission Document
11
MAHSR-C-8

Design and Construction of Civil and Building Works for the Depot on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving works for Site Formation, Abutment, Retaining Walls, Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations of OHE Masts, Piping, Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping, Boundary Wall, General Inspection Train Shed, Maintenance Depot and other Associated works At Sabarmati between MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

22-10-2020
18-02-2021 3:00:00 PM View Details
Document Type Download
Document C8EQC C8IFB
12
MAHSR-C-7

Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Ahmedabad Station, Sabarmati Station, Viaduct & Bridges, Crossing Bridges (excluding fabrication and transportation of steel truss girders) and Associated works between MAHSR Km. 489.467 and MAHSR Km. 507.599 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

08-10-2020
25-02-2021 3:00:00 PM View Details
Document Type Download
Document C7-EQC C7IFB08102020
13
MAHSR-C-1

Design and Construction of Civil and Buildings Works including Testing and Commissioning on Design-Build Lump sum price basis for Double line high speed Railway for Mumbai Underground Station, cut & Cover Tunnel and Shaft-1 from MAHSR km.-0.255 to km 0.775 at Bandra-Kurla Complex in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

20-11-2019 19-02-2021 3:00:00 PM View Details