シリアル番号 入札コード 入札タイトル 開始日 詳細
1 MAHSR - P - 3 Construction of PSC Bridge No. GAD 11 over National Highway (NH-48) at MAHSR Km 241.640, Navsari district, Gujarat on Project for the Development of Mumbai- Ahmedabad High Speed Rail 14-8-2019 見る
2 MAHSR-P-2 Construction of PSC Bridge No. GAD 10 over National Highway (NH-48) at MAHSR Km 235.379, Navsari district, Gujarat for Mumbai-Ahmedabad High Speed Railway Project (Package No. MAHSR– P-2) 14-8-2019 見る
3 MAHSR-C-6 Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Viaduct & Bridges, Crossing Bridges, Maintenance Depot and Station (Anand/Nadiad), between Vadodara (MAHSR Km. 401.898) and Ahmedabad (MAHSR Km. 489.467), excluding Works for 01 No. PSC Bridge and 04 No. Steel Truss Bridges, in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail 1-8-2019 見る
4 NHSRCL/Vadodara/Elec/2019-20/19 Electrification works of Karchiya office Building, Type -02 Quarters at Pratap Nagar and Near D Cabin, Office Building at Platform -01 at Vadodara Station, ARME office Building and other buildings in Vadodara Railway Yard in Connection with MAHSR Project 24-7-2019 見る
5 MAHSR-C-2 Construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using Tunnel Boring Machine (TBM) and New Austrian Tunnelling Method (NATM) between Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail 23-4-2019 見る
6 MAHSR - C-4 Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Viaducts, Bridges, Maintenance Depots, Stations (Vapi, Bilimora, Surat and Bharuch), and Surat Depot between Zaroli Village at Maharashtra-Gujarat Border (MAHSR Km. 156.600) and Vadodara (MAHSR Km. 393.700), excluding Works for 04 No. PSC Bridges and 06 No. Steel Truss Bridges, in the State of Gujarat and the Union Territory of Dadra and Nagar Haveli for the Project for Construction of Mumbai-Ahmedabad High Speed Rail 15-3-2019 見る