Skip to main content
Innerpage slider

सक्रिय निविदा

सक्रिय निविदा

दिनांक 1 जुलाई 2020 से एनएचएसआरसीएल ने अपनी निविदा प्रक्रिया को सीपीपी पोर्टल (ई-निविदा प्रणाली) पर स्थानांतरित कर दिया है, कृपया यहां क्लिक करें। नई निविदाओं को देखने के लिए.

क्रं. सं. निविदा रिफ नं. निविदा शीर्षक एनआईटी की तारीख नवीनतम शुद्धिपत्र प्रस्तुत करने की अंतिम तिथि दस्तावेज़
1
MAHSR-C-2

Construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using Tunnel Boring Machine (TBM) and New Austrian Tunnelling Method (NATM) between Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

28-10-2021
03-02-2022 3:00:00 PM View Details
Document Type Download
Document EQC NIT
2
MAHSR - TI-1

Design and Build Works for Construction of Training Institute Buildings (including interfacing works for installing the training equipment) (Phase-II) at Vadodara for Mumbai-Ahmedabad High Speed Rail Project.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

28-10-2021
14-12-2021 3:00:00 PM View Details
Document Type Download
Document EQC IFB-28102021
3
NHSRCL/MA/CPM/MUM/HOV/21-22/05

Hiring of Vehicles for Mumbai-Ahmedabad High Speed Rail Project in Maharashtra under Chief Project Manager, Mumbai.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

14-10-2021
06-11-2021 3:00:00 PM View Details
Document Type Download
Document NITVehicle
4
MAHSR-T-3

Design, Supply and Construction of Track and Track related Works including Testing and Commissioning on Design-Build Lump Sum Price basis for Double Line High Speed Railway between Vadodara (MAHSR Km. 393.700) and Sabarmati Depot and Workshop (MAHSR Km. 509.875) in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

For detailed tender document, Corrigendums & addendums, Please log on to CPP Portal

23-08-2021
22-12-2021 3:00:00 PM View Details
Document Type Download
Document T3IFB T3EQC
5
MAHSR– D-2

Design, Construction, Installation, Testing and Commissioning of Sabarmati Depot consisting of Workshop, Inspection Sheds, various buildings, Maintenance Facilities, and Associated works on Design Build Lump Sum Price Basis in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

29-07-2021 02-12-2021 3:00:00 PM View Details
6
MAHSR-C-1

Design and Construction of Civil and Buildings Works including Testing and Commissioning on Design-Build Lump sum price basis for Double line high speed Railway for Mumbai Underground Station, cut & Cover Tunnel and Shaft-1 from MAHSR km.-0.255 to km 0.775 at Bandra-Kurla Complex in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

20-11-2019 07-12-2021 3:00:00 PM View Details