- Mumbai-Ahmedabad Bullet Train corridor is crossing over Gorwa - Madhunagar Flyover in Vadodara through elevated viaduct
- The flyover is located at a distance of approx. 4 kms from Vadodara Bullet Train station towards Ahmedabad
- With meticulous planning and precision of execution, the launching over the flyover was completed within the block period of 10 days
- All necessary safety precautions like hard barricading, traffic diversion signages, route diversion information publication, sufficient traffic marshals and lighting in night time etc. were taken into consideration during the launching process in presence of Traffic Police, Vadodara City
Salient Features
- Length of the span – 40 meters
- Number of segments - 17 Nos.
- Pier height - 18 meters
- Weight of total span: 1078 MT
- Height from the flyover: 8.7 meters
- Width of the flyover - 16 meters