メインコンテンツに移動
メインコンテンツに移動
Jap

NATIONAL HIGH SPEED RAIL CORPORATION LIMITED

नेशनल हाई स्पीड रेल कॉर्पोरेशन लिमिटेड

myth-vs-fact-banners1

Media Brief: Completion of River Bridge on Darotha River for Mumbai Ahmedabad Bullet Train Project

Published Date

River bridge on Darotha River, Valsad district, Gujarat has been completed for the Bullet Train project.

Salient features of the river bridge are:

  • Length:  80 meters
  • Consists of two 40 meter SBS girders
  • Height of Pier – 18 m above ground level
  • One circular pier of 5 m diameter
  • This bridge is in between Boisar and Vapi Bullet Train station 
Related Images