Published Date
River bridge on Darotha River, Valsad district, Gujarat has been completed for the Bullet Train project.
Salient features of the river bridge are:
- Length: 80 meters
- Consists of two 40 meter SBS girders
- Height of Pier – 18 m above ground level
- One circular pier of 5 m diameter
- This bridge is in between Boisar and Vapi Bullet Train station

