Image Gallery
NHSRCL Signs Contract Agreement for the Work Related to Design and Construction of Underground Mumbai HSR Station for MAHSR C1 Package on 20th March 2023
NHSRCL Signs Contract Agreement for OCC (Operation Control Center) Design Contract, Production and Construction Contracts and PMC Contract for MAHSR E1 Package on 20th March 2023
NHSRCL Signs Contract Agreement for OCC (Operation Control Center) Design Contract, Production and Construction Contracts and PMC Contract for MAHSR E1 Package on 20th March 2023
President of the JICA, Dr. TANAKA Akihiko along with Shri Rajendra Prasad, MD/NHSRCL Visited Various MAHSR Construction Sites on 13th March 2023
President of the JICA, Dr. TANAKA Akihiko along with Shri Rajendra Prasad, MD/NHSRCL Visited Various MAHSR Construction Sites on 13th March 2023
President of the JICA, Dr. TANAKA Akihiko along with Shri Rajendra Prasad, MD/NHSRCL Visited Various MAHSR Construction Sites on 13th March 2023