Image Gallery
Sabarmati Multimodal Hub — a seamless link between Rail, Metro, BRTS, and the upcoming Bullet Train station
Track slab installation work in progress in Navsari district for Mumbai Ahmedabad Bullet Train project
2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai-Ahmedabad Bullet Train Project
2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai-Ahmedabad Bullet Train Project
2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai-Ahmedabad Bullet Train Project
2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai-Ahmedabad Bullet Train Project
Track slab laying and Cement Asphalt Mortar injection work in progress on the viaduct near Vadodara for Mumbai Ahmedabad Bullet Train corridor
Under construction river bridge on Daman Ganga River, Valsad district for Mumbai-Ahmedabad Bullet Train corridor
Team gathered at the _Speed and Synergy_ Annual Sports event 2024, inaugrated by Managing Director Shri Anjum Pervez_3
NHSRCL signed a contract agreement with Larsen & Toubro Limited for the design, supply and construction of Track and Track related works for MAHSR (T-3 Package) on 10th June 2022.
NHSRCL signed a contract agreement with Larsen & Toubro Limited for the design, supply and construction of Track and Track related works for MAHSR (T-3 Package) on 10th June 2022.
NHSRCL signed a contract agreement with Larsen & Toubro Limited for the design, supply and construction of Track and Track related works for MAHSR (T-3 Package) on 10th June 2022.
Hon’ble Minister for Railways & Minister of State for Railways visits MAHSR Construction site on 6th June 2022
Hon’ble Minister for Railways & Minister of State for Railways visits MAHSR Construction site on 6th June 2022
Hon’ble Minister for Railways & Minister of State for Railways visits MAHSR Construction site on 6th June 2022
Hon’ble Minister for Railways & Minister of State for Railways visits MAHSR Construction site on 6th June 2022

