Skip to main content
Skip to main content
Eng

NATIONAL HIGH SPEED RAIL CORPORATION LIMITED

नेशनल हाई स्पीड रेल कॉर्पोरेशन लिमिटेड

Media Brief: Completion of River Bridge on Kolak River for Mumbai Ahmedabad Bullet Train Project

Published Date

River bridge on Kolak River, Valsad district, Gujarat has been completed for the Bullet Train project.
Salient features of Kolak River bridge are:

  • Length: 160 meters
  • Consists of 4 Full Span Girders (40 meters each)
  • Height of Piers – 14 m to 23 m
  • Circular piers of 4 m (2 Nos.) and 5 m diameter (3 Nos.)
  • This bridge is in between Vapi and Bilimora Bullet Train station. Other completed rivers between two stations are Auranga and Par River
  • The river originates from Saputara hills near Valveri and meets in Arabian sea
  • Kolak river is 7 kms from Vapi Bullet Train station and 43 kms from Bilimora Bullet Train station
Related Images