High speed trains on Mumbai-Ahmedabad High Speed Rail Corridor will operate at a speed of 320 Km/hr covering a distance 508 Km and 12 Stations. There will be 35 trains per day/one direction, with a frequency of 20 mins in peak hours and 30 mins in non-peak hours.
The entire journey will be completed in about 2 hours 7 minutes with limited stops (at Surat, Vadodara and Ahmedabad) and all stops service will take 2 hours 58 minutes. Operations Control Centre for MAHSR corridor will be located at Sabarmati.
Detailed Operation Plan:
1st Year of Operations | 10th Year of Operations | 20th Year of Operations | 30th Year of Operations | ||
---|---|---|---|---|---|
Train configuration | 10 | 10/16 | 16 | 16 | |
Number of rakes | 24 | 24+11 | 44 | 71 | |
Number of trains (per day/one-direction) | 35 | 51 | 64 | 105 | |
Train capacity | 690 | 690/1250 | 1250 | 1250 | |
Passenger seats (day/one direction) | 17,900 | 31,700 | 56,800 | 92,900 | |
Number of trains (per day/one direction) | Peak Hour | 3 | 4 | 6 | 8 |
Off peak | 2 | 3 | 3 | 6 |