Salient Features
- MAHSR viaduct crossed over Petlad Canal (irrigation canal of Mahi river), Anand District, Gujarat
- As Full Span Launching Method (FSLM) was not possible, Span By Span (SBS) method was used
- Water flow was not obstructed during the construction phase
- 19 segments were joined to make 45 m span over the canal
- 1000 MT Full Span Girder was moved over the SBS span to complete the construction