Temporary structure being constructed at Chainage 167.800 Km
NGL, Excavation, Reinforcement, Shuttering, Formwork, RCC works being carried out at different Pier location like 205P12 to 205P18 in Indergota, Valsad
NGL, Excavation, Reinforcement, Shuttering, Formwork, RCC works being carried out at different Pier location like 205P12 to 205P18 in Indergota, Valsad
Geotechnical Investigation being carried out near Daman Ganga river at Chainage166.850KM